How do we stop fuel, transport and damage waiver being left off hire quotes?

Short answer For a UK equipment hire company, the dependable fix is to build transport, fuel and damage waiver into the quote itself, so leaving one off is a decision rather than an oversight. Make each a default line, price delivery from a rate table, record customer-specific terms on the account, and flag anything unpriced before the quote goes out.

Why these three charges get left off

They aren't the kit. The rate card prices what is going out. Transport, fuel and damage waiver are priced around it, and each depends on something the rate card doesn't hold: the vehicle and distance for delivery and collection, whether the customer or you refuels, and the damage waiver terms agreed with that account.

So they are usually added last, from memory, by whoever is building the quote. That works on a quiet day when the person who knows the terms is in. It stops working when someone is covering, or when a quote has to go out in a hurry.

The cost is quiet. A charge that isn't on the quote isn't on the contract, so it isn't billed, and nobody sees the gap unless they go looking.

How to stop it: five steps

  1. Decide which charges are standard. For transport, fuel and damage waiver, write down whether each applies always, sometimes or never, and what changes the answer: the account, the kit, the depot or the length of hire.
  2. Make them default lines on the quote. If all three are already on the quote when it opens, taking one off is a choice. If they have to be added, leaving one off is the easy path.
  3. Price delivery and collection from a table, not from memory. A simple table of vehicle type, depot and delivery area gives everyone the same figure for the same job. When your costs change, you update the table, not every quote.
  4. Record customer-specific terms on the account. A customer whose damage waiver is waived, or whose transport is agreed at a set rate, should show that when the quote is started. The right default then appears without anyone needing to know the account.
  5. Flag anything unpriced before the quote goes out. A delivery area that isn't in the table should stop the quote until someone prices it, rather than letting it go out at nothing. Where someone removes a charge, record why.

Check your own quotes this week

Take five recent hire quotes. For each, check whether transport, fuel and damage waiver are on it, or were taken off on purpose. Count how many have a charge missing that nobody decided to remove.

There is no industry figure here, on purpose. Your own count is the useful number, and it shows which of the three is slipping.

When a checklist is enough

Sometimes it is. If one or two people quote, your terms are much the same for nearly every customer and volume is low, a quote template with the three lines already filled in and a short checklist will do most of the job.

A CRM starts to earn its place when several people quote, when terms differ by account, depot or vehicle, or when charges agreed on the quote have to reach the contract in a separate hire system without being typed again. Connecting a CRM to a hire system such as Syrinx or InspHire is a separate project from setting up the quote. Until the two are connected, a charge on the quote still has to be keyed onto the contract.

One question I ask

On any hire project, I ask how delivery is priced today, and whether two people on your hire desk would give the same customer the same figure for the same job.

Common follow-up questions

What does damage waiver mean on a hire quote?

It is usually a charge, set by each hire company's terms, that limits what the customer pays if the kit is accidentally damaged during hire. Because the terms differ between companies, and sometimes between accounts, it works best as a defined line on the quote rather than something added from memory.

Can the quote work out delivery and collection automatically?

Yes, once delivery is priced from a table of vehicle, depot and delivery area, because the quote can then look the figure up. The table is the real work. It is worth doing before any software, because it shows where today's figures differ.

What if a customer negotiates one of these charges away?

Take it off on purpose and record the reason. A charge removed with a reason is a pricing decision. A charge that is simply missing is a leak you can't see.

Does this replace our hire system?

No. Your hire system still raises the contract and does the invoicing. The question is how charges agreed on the quote reach it: typed in again today, or carried across once the two systems are connected, which is a separate project.

Not sure how your quoting stands today? The Hire Process Audit looks at quoting, availability, off-hire and follow-up. It takes about four minutes and needs no email.

See the Hire QuickStart